Applying for new electric and/or natural gas requires one critical piece of information that we need within three business days of applying for new service — a completed property site sketch and liability waiver form. Service installation will not proceed until we receive the form.
Property site sketch and liability waiver form
The detailed property site sketch and liability waiver must contain the following, if applicable:
- Signature of property owner or authorized representative
- Customer name, service address, city, state, ZIP code, phone number
- Name of road in front of building and nearest crossroad
- Building site dimensions in feet
- Footage building is set back from road and lot lines
- Structure footprint
- North orientation
- Desired electric and gas meter locations and footages from nearest corner of livable space (indicate E and/or G).
Note: Position meter locations to avoid conflicts with building openings and ignition sources. We will make final determination of meter locations, based on applicable building, fuel and electrical codes.
- Wells and private water lines, including underground sprinkler systems with connecting lines to buildings
- Municipal water and sewer laterals
- Septic tank with primary and alternate drain fields (private sanitary system) with connecting lines to building
- LP fuel lines/tanks with connecting lines to buildings
- External wood furnaces and associated buried heating with connecting lines to buildings
- Geo thermal heat pumps with connecting lines to buildings
- Buried sump pump lines and down spouts
- Location of porches, patios, decks and outbuildings (including future plans)
- Location of all private underground facilities, including, but not limited to: private fuel runs, private electric wires, private communication wires and others
Send completed form to:
Wisconsin Public Service
New Service Installation Team
P.O. Box 19001
Green Bay, WI 54307-9001
Fax: 866-430-6021